The works comprised of the demolition of the existing garages and store buildings due to these being beyond repair to form a new building for the students.
The building was largely of masonry construction with an oak side structure to form a new arts/games room and television room at ground floor level with a separate entrance and staircase to two music rooms at first floor level.